Scope and cost follow the latest publication located on the public authority’s website, with its publication or consultation date. Supplementary sources must relate to specific ANI, DIPP, port or private-road projects and do not replace the official reference. Economic inferences are labelled tentative.
| project and programme profiles | Institution / counterpart | Next milestone / verification | Stage-specific needs · editorial guidance |
|---|---|---|---|
S21 ↗ | ANI · Guatemala Municipality | Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal. | Technical input on Radial 6 connections, demand and lifecycle costs. |
S03 ↗ | ANI · contracting authority to confirm | Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal. | Assessment of North–East alternatives and connections to the existing network. |
S03 ↗ | ANI · contracting authority to confirm | Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal. | Passenger flows, universal accessibility and the centre’s operating model. |
S03 ↗ | ANI · contracting authority to confirm | Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal. | Capacity, interconnection and route alternatives for Petén Itzá. |
S03 ↗ | ANI · contracting authority to confirm | Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal. | Grid integration for San Mateo Ixtatán and technical corridor assessment. |
S03 ↗ | ANI · contracting authority to confirm | Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal. | Demand scenarios, transmission capacity and regional coordination. |
S03 ↗ | ANI · contracting authority to confirm | Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal. | Waste characterisation, demand for recovered materials and treatment alternatives. |
S03 ↗ | ANI · contracting authority to confirm | Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal. | Regional demand, runway and terminal infrastructure, and operating standards. |
S03 ↗ | ANI · contracting authority to confirm | Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal. | Functional requirements, user privacy and the centre’s maintenance services. |
S03 ↗ | ANI · contracting authority to confirm | Ask ANI about scope, available studies and the preparation timetable; identify the applicable formal process before submitting a proposal. | Visitor experience, use capacity and conservation of El Jaibal’s surroundings. |
S30 ↗ | CIV · ANI · CONVIA | Read the ANI project page and confirm purchasing procedures and supplier requirements with the concessionaire. | Pavements, structures, road safety and asset management under the existing contract. |
S15 ↗ | VAS private operator | Review operator updates and ask about private supplier processes for operating services or announced expansions. | Payment interoperability, operational safety and network maintenance. |
S17 ↗ | Xochi private developer and operator | Contact the operator about supplier requirements and potential cooperation linked to operations. | Performance of the open corridor, user service and operational environmental management. |
S18 ↗ | Corredor Verde, S.A. · applicable municipal permits | Ask the promoter about work scope and private procurement procedures before offering supplies or services. | Road and landscape integration, quality control and maintenance preparation. |
S12 ↗ | Guatemala Municipality · Cablevía and concession group; coordination with Mixco | Ask the concessionaire about delivery stages and supplier-chain requirements. | Civil works and cable-transport interfaces, accessibility and service readiness. |
S10 ↗ | Guatemalan and UK governments · joint working group; implementing entity to be specified | Review the cooperation framework and confirm the implementing body, scope and published procedures before preparing a bid. | Demand, corridors, railway interfaces and structuring options. |
S08 ↗ | Mindef · CIV · USACE; port coordination with EPQ to be specified in the instruments | Ask EPQ about the public scope of cooperation and confirm which institution handles each study or procurement. | Capacity planning, bathymetry and coordination of port infrastructure and operations. |
S08 ↗ | Mindef · CIV · USACE | Ask CIV for public information on components, studies and the procuring entity; follow published procedures. | Component prioritisation, surveying, designs and definition of agreement scope. |