Read the legal text
Investor Guide
Prepare to participate under each delivery model. Identify the counterpart, assemble documents and distinguish available information from items still to be confirmed.
Priority roads · DIPP
This guide organises information and suggests preparation steps. Binding requirements come from the applicable framework, tender documents and project contract. An enabling law does not establish an open tender.
Who initiates
DIPP, a deconcentrated CIV body, structures, procures and supervises.
How to participate
The law admits domestic and foreign bidders and consortia. Entry depends on published tender documents.
Remuneration
Availability payments linked to performance; the law prohibits user tolls on these projects.
What to prepare now
Practical guidance · not an admission requirementPrepare design, construction and maintenance credentials, lifecycle costing, financial capacity and consortium structure. Model availability-based remuneration and performance deductions.
What to request to assess the project
Request official road prioritisation, studies and rights of way, service indicators, tender and contract documents, measurement and deductions, payment sources and applicable FOVIP documentation. Check land, permit and site-handover risk allocation.
What remains to be confirmed
This review did not verify official publication of an updated regulation or model tender package. Verify issuance, institutional readiness, FOVIP instruments and the specific notice before treating a project as procurement-ready.
Reference documents
2026-05-14 · Institutional update · not a regulation
Initial review of selected sources; it does not certify the absence of other documents. Review dates do not alter source dates or legal effect.
Update history
2026-11-19 · v1.0 · First edition: six guides, preparation pathways and tracking of pending documents.