GUATEMALA / 2026

Investor Guide

Prepare to participate under each delivery model. Identify the counterpart, assemble documents and distinguish available information from items still to be confirmed.

v1.0Document review: 2026-11-19Next planned review: 2027-01-19

Priority roads · DIPP

This guide organises information and suggests preparation steps. Binding requirements come from the applicable framework, tender documents and project contract. An enabling law does not establish an open tender.

Who initiates

DIPP, a deconcentrated CIV body, structures, procures and supervises.

How to participate

The law admits domestic and foreign bidders and consortia. Entry depends on published tender documents.

Remuneration

Availability payments linked to performance; the law prohibits user tolls on these projects.

What to prepare now

Practical guidance · not an admission requirement

Prepare design, construction and maintenance credentials, lifecycle costing, financial capacity and consortium structure. Model availability-based remuneration and performance deductions.

What to request to assess the project

Request official road prioritisation, studies and rights of way, service indicators, tender and contract documents, measurement and deductions, payment sources and applicable FOVIP documentation. Check land, permit and site-handover risk allocation.

What remains to be confirmed

This review did not verify official publication of an updated regulation or model tender package. Verify issuance, institutional readiness, FOVIP instruments and the specific notice before treating a project as procurement-ready.

Reference documents

Initial review of selected sources; it does not certify the absence of other documents. Review dates do not alter source dates or legal effect.

Update history

2026-11-19 · v1.0 · First edition: six guides, preparation pathways and tracking of pending documents.